Projects

Hollywood Burbank Airport
Burbank, California

Greenbrook Engineering is working on the expansion of this beautiful iconic airport. With 8,000 tons of steel comprising of different complex columns, beams and trusses, this is one of our most iconic projects.
Charlotte Airport Terminal Lobby Expansion Project executed over multiple years with large number of revisions both due to contract drawing revisions and field conditions. GBE provided unwavering support to CM STEEL and continues to help in modifications as needed.

CLT Terminal Lobby Expansion
Charlotte, North Carolina

AU Plainsman Park First Base Club
Auburn, Alabama

A great addition to the AU Plainsman Stadium, boasting excellent engineering with complex design and connections turned to a simple display of excellence.
A project with Complex Durafuse connections and Architecturally Exposed Structural Steel (AESS) Lobby stair.

Samaritan Health Medical Campus
Watertown, New York

Barbara Walker Crossing
Portland, Oregon

Award-winning footbridge in Oregon, featured on the cover of Modern Steel Construction magazine.
Brilliant theatrical pedestal for artists surrounded by architectural complexity merged with simple engineering.

Texas Tech Theatre Project
Lubbock, Texas

Tyndall Lodging Facility
Tyndall, Florida

Crafting Stability: Steel Detailing Expertise for Tyndall Lodging Facility.
Simplified complexity! A unique Stadium project with all the elements of Main and Misc steel. The cantilever spectator stand adds beauty to the structure.

JSU Football Ops
Jacksonville, Alabama

FCC - New Science Building
Fresno, California

Detailing started with incomplete contract drawings and the model was constantly revised based on progressive design, making this a very complex Design-Build project.
Multi-storeyed Hospital with large number of skewed and curved members and executed in 2 phases. Phase 2 required a complete co-ordination with Phase 1 to ensure proper connectivity between the 2 buildings making the 2 structures as one single structure. This job, like all our others, fit perfectly.

Sentara Leigh
Norfolk, Virginia

Mitsubishi Vacuum Chamber
Pooler, Georgia

This is an iconic project with steel plates joined together to make a “vacuum chamber”. It’s a dense structure with complete seal weld. Welds were modelled and reports generated for weld quantum.
This is a Distribution Center with over 9,000 tons, completed in 8 months from start to finish. When you have a very fast paced project, we’re the right source to get it done.

Project Bruin
Oxnard, California

Carolina Gardens Amenity Center