Projects
Hollywood Burbank Airport
- GC: Holder
- Engineer: Buehler
- Architect: Cannon Design
- Fabricator: Sunsteel LLC
Greenbrook Engineering is working on the expansion of this beautiful iconic airport. With 8,000 tons of steel comprising of different complex columns, beams and trusses, this project is going to be among the list of our iconic projects.
Charlotte Airport Terminal Lobby Expansion Project executed over multiple years with large number of revisions both due to contract drawing revisions and field conditions. GBE provided unwavering support to CM STEEL and continues to help in modifications as needed.
CLT Terminal Lobby Expansion
- Engineer: Laurene, Rickher & Sorrell, P.C.
- Architect: Das Architecture, Inc
- Fabricator: C.M. Steel, Inc
AU Plainsman Park First Base Club
- GC: Stone Building Comapny
- Engineer: CDFL Architects + Engineers
- Architect: LBYD Engineers
- Fabricator: Garrison Steel
A great addition to the AU Plainsman Stadium, boasting excellent engineering with complex design and connections turned to a simple display of excellence.
A project with Complex Durafuse connections and Architecturally Exposed Structural Steel (AESS) Lobby stair.
Samaritan Health Medical Campus
- GC: Graham
- Engineer: PCS Structural Solutions
- Architect: Zimmer Gunsul Frasca
- Fabricator: Sunsteel LLC
Barbara Walker Crossing
- GC: R&H Construction
- Engineer: KPFF Consulting Engineers, Portland OP
- Architect: Walker/Macy, Portland OR
- Fabricator: Supreme Steel, Portland OR
Award-winning footbridge in Oregon, featured on the cover of Modern Steel Construction magazine.
Brilliant theatrical pedestal for artists surrounded by architectural complexity merged with simple engineering.
Texas Tech Theatre Project
- GC: Lee Lewis Construction
- Engineer: Martinez Moore Engineers
- Architect: Holzman Moss Bottino Architecture
- Fabricator: Meridian Construction Corp
Tyndall Lodging Facility
- GC: BL Harbert International
- Engineer: USACE
- Architect: USACE
- Fabricator: Garrison Steel
Crafting Stability: Steel Detailing Expertise for Tyndall Lodging Facility.
Simplified complexity! A unique Stadium project with all the elements of Main and Misc steel. The cantilever spectator stand adds beauty to the structure.
JSU Football Ops
- GC: Brasfield Gorrie
- Engineer: Jax State
- Fabricator: Garrison Steel
FCC - New Science Building
- GC: Harris Construction
- Architect: Lionakis
- Fabricator: Kern Steel Fabrication, Inc
Detailing started with incomplete contract drawings and the model was constantly revised based on progressive design, making this a very complex Design-Build project.
Multi-storeyed Hospital with large number of skewed and curved members and executed in 2 phases. Phase 2 required a complete co-ordination with Phase 1 to ensure proper connectivity between the 2 buildings making the 2 structures as one single structure. This job, like all our others, fit perfectly.
Sentara Leigh
- GC: The Whiting-Turner Contracting Co
- Architect: HDR Architecture Inc.
- Fabricator: North State Steel LLC
Mitsubishi Vacuum Chamber
- GC: Batson Cook
- Fabricator: Steelfab
This is an iconic project with steel plates joined together to make a “vacuum chamber”. It’s a dense structure with complete seal weld. Welds were modelled and reports generated for weld quantum.
This is a Data Center with over 9,000 tons, completed in 8 months from start to finish. When you have a very fast paced project, we’re the right source to get it done.
Project Bruin
- GC: Clark Construction
- Fabricator: Sunsteel LLC
Carolina Gardens Amenity Center
- GC: Monteith
- Engineer: LHC Structural Engineers
- Architect: Boomerang Design
- Fabricator: 3 Sons Steel